INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Dry Dock Foundation - Sub Base Coarse Layers
2

Dry Dock Foundation - Sub Base Coarse Layers

Dry Dock Foundation - Sub Base Coarse Layers

(OP)
Dear Friends,

We have Dry Dock Ship Repair Foundation (100 mtr x 11mtr x 0.5 mtr thick) below which there lies 200mm thick subbase compacted to 100 % MDD. We are supposed to demolish the foundation and remove the sub base layer, re-lay, compact, PCC and then lay concrete foundation a new. While excavating 200mm sub base, due to a long excavator teeth, the depth increased to 300-400mm. After 200mm subbase, we have dune sand ( very fine sand)

I need your valuable feedbacks on the following,

1. Can we restore back the extra depth (i, e 100-200mm) with the same dune sand and then put back 200mm subbase? or to re-lay 200mm x 2 layers and compact?

2.How much min built-up depth with sub base should be there below a ship repiar dock foundation?

3. How to go about executing the job, i mean dressing, levelling etc?

Pls help.
 

 

RE: Dry Dock Foundation - Sub Base Coarse Layers

1.  Yes, if the sand is compactable and confined, you should be able to restore with same material.  If sand is saturated, you might consider a gravel backfill to bring to level.

2.  This depends on the loads and use conditions. Can't say without more info.

3.  Compact in thin lifts (layers) to achieve required compaction.  Grading can be done with a variety of devices, including a small front loader, a box blade, and other methods.

RE: Dry Dock Foundation - Sub Base Coarse Layers

in order to achieve maximum density with clean sand you need good moisture control and confinement. Without both it will be difficult to compact. You would need to use a relative density method rather than proctor.  70% RD is usually acceptable.

Rather than bring in gravel, bring in a good, well graded crushed aggregate. This would be the same material typically used for road base. Much easier to compact and relatively inexpensive.

RE: Dry Dock Foundation - Sub Base Coarse Layers

cvg...the gravel is only if the water table is an issue.  Base material will pump if water table is at that level...gravel won't.

RE: Dry Dock Foundation - Sub Base Coarse Layers

Ron - missed that, you are right - base material is not as free draining as gravel. If water table is that high, further improvements might also be necessary - depending on what type of material the subbase is.

If no water than aggregate base is the way to go.

RE: Dry Dock Foundation - Sub Base Coarse Layers

cvg..I agree...base material is better way if not a water issue.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources