INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Design Code break B31.3 and B31.8

Design Code break B31.3 and B31.8

Design Code break B31.3 and B31.8

(OP)
Ref: http://www.eng-tips.com/viewthread.cfm?qid=193285

Pipeline sections at stations have line taps for pressure instrument and Pig signaller. These have flanged 2" branch connections. The code break between the pipeline and the piping occurs at the first flange after the branch. If the branch pipes are to be procured in accordance to the line pipe specification, this will entail supplementary manufacturing and testing QA, which is additional to the requirements stated in the ISO 3183 Gr L450 QCS Line pipe spec. Whereas the piping component specifications are to industry standard ASTM A106 Gr B and  NACE MR0175 requirements. The small size and small quantity of components will be difficult to obtain through the pipeline spec. I am inclined to procure the components to the Piping specification

What problems will I encounter if the code break is moved to the branch weld. Don't think the hydrotest is a constraint. The test pressure will be limited by the flange rating.

RE: Design Code break B31.3 and B31.8

To avoid any possible welding problems you should put in a short segment of L360 between the A106 and L450.
 

**********************
"The problem isn't working out the equation,
its finding the answer to the real question." BigInch
http://virtualpipeline.spaces.live.com/

RE: Design Code break B31.3 and B31.8

(OP)
I am told that Construction has qualified WPS available for welding an A105 branch fitting on to API 5L X65 pipe. However for the ISO pipe, it will need a new qualification, from a procedural stand point, since the ISO pipe may come under an unlisted material.

 

RE: Design Code break B31.3 and B31.8

Shouldn't be any other problems I know of.

For a gas line, its usual to design everything on the pipeline to B31.8, including pig signals and other instrument connections.  You might want to double check that your designers actually intended the sig to be B31.3

I wouldn't normally change to B31.3 until actually reaching an isolation flange or some other designated point located between the station piping and pipeline piping, launchers and receivers usually being part of the pipeline scope of work.   

**********************
"The problem isn't working out the equation,
its finding the answer to the real question." BigInch
http://virtualpipeline.spaces.live.com/

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources