INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

How to calculate probabilistic MCE?

How to calculate probabilistic MCE?

How to calculate probabilistic MCE?

(OP)
The county engineer is asking for a complete soil investigation report per 2007 CBC (IBC 2006, pretty much), chapter 18, section 1802.2.7

The permit is ready to be issued. 1802.2.7 has this exception:

no study is required provided that peak ground acceleration is equal to SDs/2.5 is used. SDs must be determined according to ASCE7 21.2.1:


ASCE7-05, Section 21.2.1 Says "Probabilistic MCE. The probabilistic MCE spectral response accelerations shall be taken as the spectral response accelerations represented by a 5 percent damped acceleration response spectrum having a 2 percent probability of exceedance within a 50-yr. period."

This is confusing me. The USGS factors are given as a .2 second spectral acceleration. 21.2.1 asks for SDs using a 2 percent probability.

No idea how to get the SDs value. Any help?

(Note: this is a duplicate-- previously posted in foundation engineering forum, where it collected e-dust.)  

RE: How to calculate probabilistic MCE?

(OP)
Here is what I have concluded:

I have not been able to find the basis for SDs. So, I am guessing that SDs IS the 2 percent probability statistic, and I do not need to convert this value.

I used the Fa value from the USGS Site Coefficient generator, and interpolated backward using Table 11.4-1 to get Ss. From here I used SMs = Fa * Ss and SDs=2/3*SMs.

Can anyone critique my assumption?  

RE: How to calculate probabilistic MCE?

(OP)
Well....

The architect for whom this work was performed found an ICC report stating that this particular home MUST have a soil report... I am receiving this doc as a fax now...

But, if anyone can answer the question about the probability basis of SDs in ASCE7, I would like to know!  

RE: How to calculate probabilistic MCE?

(OP)
The ICC paper referenced 1802.2-- which is not about Seismic Design Category D.

18.2.2.7 is the exception we tried to use.

The actual Cs for the site was .088. SDs/2.5 came to .229. In the N-S direction, this was doable. In the E-W direction (narrow dimension), this resulted in much higher concentrations and large hold-downs and increased footings. So, the owner will pay $1200 for a geo report.  

RE: How to calculate probabilistic MCE?

Dairy Designer,
You seem to be confusing a site specific ground motion study with a soils investigations. A soils investigation may or may not include a site specific ground motion study. Look at ASCE 7 Section 11.8.3 for requirements similar to the IBC but presented differently.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources