INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Grout to Rock Bond Stress

Grout to Rock Bond Stress

Grout to Rock Bond Stress

(OP)
There are several publications that list average bond stresses between grout and rock for differing types of rock, but none of the information I have at my disposal(FWHA & PTI) correlates grout compressive strength of grout to bond stress.

Intuitively, it seems like there must be a minimum grout compressive strength needed to be able to achieve the ultimate grout to rock bond stresses, but I cannot find any information as to what that may be.

PTI recommends a minimum grout strength of 3,000 psi for all grout, so it may be reasonable to assume that ultimate bond stresses can be achieved if the grout is at least 3,000 psi.  But at what point does the compressive strength of grout begin to negatively impact grout to rock bond stresses?

RE: Grout to Rock Bond Stress

I'm not sure you will ever know.  If a tieback anchor is tested successfully, the grout strength is OK, no matter what the strength.  If the anchor fails, there could be several reasons, grout strength being one of them but also the least likely reason.  Grout strength is rarely the cause of a failed anchor.  I never call for grout cube testing.

www.PeirceEngineering.com

RE: Grout to Rock Bond Stress

(OP)
I agree that it doesn't matter if a tieback is sucessfully tested.  If you had a micropile job it might be a different story, since you don't typically test all of your production micropiles.

The answer to the question is easy for soil, as long as the grout is harder than the soil you should be able to achieve your ultimate bond stress for soil.  But in rock, the grout may never get as hard as the surrounding rock...

RE: Grout to Rock Bond Stress

Strength testing of grout wouldn't tell you much about the performance of tiebacks.  Strength testing is done with unconfined specimens, while the actual grout in place is confined.

RE: Grout to Rock Bond Stress

I had an old article that said minimum grout strength was related to the relative modulus of the two materials.

RE: Grout to Rock Bond Stress

Low grout strength could be the cause of failure for a tieback or a micropile but it is hard to prove.  Also, if a contractor is sloppy with the grout mix, he is probably sloppy with other aspects of the installation, such as cleaning the hole, tremie grouting, and use of centralizers and/or spacers - any of which can cause or contribute to failure.

www.PeirceEngineering.com

RE: Grout to Rock Bond Stress

For all the above - we use are using 20MPa at 3-d and 40MPa at 28-d - in peridotite.

RE: Grout to Rock Bond Stress

In either case, micropiles or tieback anchors, there should be a testing program that verifies the grout strength.  Micropiles usually have one or two verification tests initially on a project.  That in turn will not only yield results for the grout to rock bond stress, but that the grout strength is inherently adequate.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources