Drafting - Gap
Drafting - Gap
(OP)
question?
how long will must we use the gaps in drafting or is there an alternative? I have looked at NX7 and it still the common method - or?
give me some advice - thanks - from austria
how long will must we use the gaps in drafting or is there an alternative? I have looked at NX7 and it still the common method - or?
give me some advice - thanks - from austria





RE: Drafting - Gap
John R. Baker, P.E.
Product 'Evangelist'
Product Design Solutions
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/
To an Engineer, the glass is twice as big as it needs to be.