INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Butt welded shaft fatigue strength

Butt welded shaft fatigue strength

Butt welded shaft fatigue strength

(OP)
How can the tensile fatigue limit be estimated in a 1.25 inch shaft that has been butt welded assuming it has been properly prepared and welded?  I've looked in British Standard 7608 and a couple other machine design books and do not see any examples of that kind of connection in a shaft, only for plating tht is butt welded.
Thanks
Larry

RE: Butt welded shaft fatigue strength

Quote:

How can the tensile fatigue limit be estimated in a 1.25 inch shaft that has been butt welded assuming it has been properly prepared and welded?

First off, I would determine the fatigue strength for the base material of the shaft, assuming no butt weld. You can search for this information or if it is carbon or low alloy steel, you can use a rough correlation that the high cycle fatigue strength will be 0.5 x ultimate tensile strength of the steel.

Once you have the fatigue strength of the base material with no weld, you now have to establish an appropriate knock-down factor because you have placed a metallurgical notch in the original shaft base material. The heat from welding alters the original microstructure of the base metal unless the shaft is re-heat treated after welding, which can be done but presents concerns for distortion.

If you have a full penetration butt weld with the weld crown blend ground flush with no stress risers, I would use a knock down factor of 0.85 x the fatigue strength.

How did I arrive at this? The 0.85 is a common factor used for castings versus wrought material. In this case, the weld metal is cast so this is where I would start regarding a knock-down factor for welds.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.