What is the max penetration allowed in a post-tensioned slab
What is the max penetration allowed in a post-tensioned slab
(OP)
the structural drawings say
for those tendons
clear cover is 2" @ top and 1" @ bottom
so usually what is the maximum penetration allowed for fasteners (from dry wall) to such slab?
Thanks
for those tendons
clear cover is 2" @ top and 1" @ bottom
so usually what is the maximum penetration allowed for fasteners (from dry wall) to such slab?
Thanks