INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Line Pipe MTO

Line Pipe MTO

Line Pipe MTO

(OP)
Dear all,

I have to prepare a material take off for line pipe to be used offshore.

My question is regarding spare quantities: is there any standard, guidelines or recomended practice I could use to estimates occurency of wet buckle, spare for welding qualifications, damage due to pipe handling... ?

Thank you  

RE: Line Pipe MTO

1%, 2%, 3%, 5% are typical factors used depending on your interpretation of the elevation profile knowledge, combined degree of difficulity of the work, material, OD and wall thickness, water depth, transportation, weather conditions, contractor's equipment and experience factors and the difficulty of time to procure and deliver more of the same pipe to your work location if needed in a hurry.

**********************
"Pumping accounts for 20% of the world's energy used by electric motors and 25-50% of the total electrical energy usage in certain industrial facilities."-DOE statistic (Note: Make that 99% for pipeline companies) http://virtualpipeline.spaces.live.com/

RE: Line Pipe MTO

In absence of detailed cut sheets I normally specify 2.5% rounded up to the nearest number of pipe lengths for every size. But that's for pipe spools, not pipeline laying.
Out of curiosity, do you qualify welders when you're on the rig, offshore? What happens if a welder fails his test?

RE: Line Pipe MTO

1.) Test on/before hire.
2.) You don't want to know.

**********************
"Pumping accounts for 20% of the world's energy used by electric motors and 25-50% of the total electrical energy usage in certain industrial facilities."-DOE statistic (Note: Make that 99% for pipeline companies) http://virtualpipeline.spaces.live.com/

RE: Line Pipe MTO

I'd toss him off the deck but the environmentalists would probably have something to say about that

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources