Hi,
I want to export into excel format, the planned work and the actual work, per month. I tried with Data analysis to excel tool and it is possible to export only per week, and allows only 256 colonms.
Is anybody found a solution for that?
Thanks,<
G
I want to export into excel format, the planned work and the actual work, per month. I tried with Data analysis to excel tool and it is possible to export only per week, and allows only 256 colonms.
Is anybody found a solution for that?