INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Is this acceptable?
4

Is this acceptable?

Is this acceptable?

(OP)
Hello fellow PV collegues,

A long pressure vessel, U-stamped and Natl Board registered, has been completely fabricated, ready to ship to US. Due to shipping constraints, it is cut in two, cut edges prepared for welding on site by an 'R-stamp' qualified contractor, who also re-tests the vessel.

 Is this acceptable? your opinion will be greatly appreciated, thanks.

RE: Is this acceptable?

Yes.

RE: Is this acceptable?

It is shame that we (myself) included cannot get the basis like length, width and height straight. O'well happens to the best of us.

No dramas in chopping it up, providing you are getting the R-stamp and AI sign-off onsite.

RE: Is this acceptable?

Just need to be careful if the vessel was PWHT and that the PQR's etc were qualified for at least another cycle.

RE: Is this acceptable?

(OP)
Thanks guys; yeah, it is a shame we can never get the length right.:) Seriously, the alternatives are recipes for disaster, I have been there.

#1 Have the vessel fabricator do the field assembly himself. [Very expensive, union problems, possible sabotage].
#2 Vessel owner(O)has field work done by a qualified site contractor(C), who submits U-2 to the vessel fasbricator (F), who then issues the U-1. Since C is hired by O, he would not care less about F's QC needs; result is big arguments and problems. C's work has to be under the control and supervision of F, but it does not happen since C is being paid by O.
#3 Make C responsible for everything, have him sign the U-1; this is unfair to him and crazy!

So yes, oops too long, chop it n'ship it to site for repairs!     

RE: Is this acceptable?

2
wait a minute

we have done this on numerous occasions and have not had a bit of problem with field contractors or owners.

the trick is to build the vessel  with cutting it in halves from the beginning and having it prepped correctly for ease of field assembly with correct weld bevels to suit the field contractors weld procedure and fit up procedures.

our shop does not do any field work.  period.  we are not insured for it and do not have field equipment.  many shops do not have the asme code field work in there manual and are not allowed by ASME to do work at locations other than their primary shop.

what we do, not saying it is the only way, is we build a complete vessel, pwht if required, hydrotest, issue a U-1A, match mark orientation at cut line, install fit-up keys to insure proper orientation is maintained, make a cut at proper location and bevel for field weld.  The field makes the weld, pwht if req'd, all required NDE and issures a R report and stamp.

There is no reason for any hard feelings if everyone does there job correctly





 

RE: Is this acceptable?

Well said vesselfab. A star.
 

RE: Is this acceptable?

(OP)
vesselfab, we are intending to do exactly what you do, see my initial question, thanks.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources