INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Is MPI Mandatory for Group P1 Material after PWHT

Is MPI Mandatory for Group P1 Material after PWHT

Is MPI Mandatory for Group P1 Material after PWHT

(OP)
Dear Friends
Project - Conversion of Tanker Vesel into FPSO Platform
Material Group 1- ASTM A106-B x 6" x 21.95thk ( Process Piping )
Weld Process - GTAW / SMAW. Applicable Code-ASME B31.3
Upon completion of PWHT/Hardness Test , RT Done- It passed. Did not do MPI.
The purpose of MPI is to detect Surface/Sub-Surface Discontinuities which could be missed out by RT.
But here I'm working with Plain Carbon Steel.
Is it mandatory to do MPI?. Where I can find this requirement in ASME B31.3 or in any other ASME codes.
I'ne gone through Chapter VI, but found nothing about MPI Requirement after PWHT(Stress Relief )
Appreciate prompt guidance and advise
 

RE: Is MPI Mandatory for Group P1 Material after PWHT

There is no requirement in B31.3 to do MPI after RT of a butt weld.

RE: Is MPI Mandatory for Group P1 Material after PWHT

Why are you asking the question?  Is it because you are now being requested to justify omission of MT?

Steve Jones
Materials & Corrosion Engineer
http://www.linkedin.com/pub/8/83b/b04
 

RE: Is MPI Mandatory for Group P1 Material after PWHT

(OP)
Dear Mr.SJones
Yes, Based on Para 341.3.1a- I did not carry out MPI. I want to confirm if my understanding is indeed correct. If is mentioned in any other section, pls advise me
Thanks

RE: Is MPI Mandatory for Group P1 Material after PWHT

I might be missing something but para 341.3.1a talks about examinations having to be after PWHT for materials in groups P3, P4 and P5.  It doesn't have anything to do with defining what examination is required nor does it apply to a P1 material ?

Which edition of code are you using and can you confirm the Para reference...

RE: Is MPI Mandatory for Group P1 Material after PWHT

(OP)
Dear Sir
You are absolutely right. It is only talk about P-Nos- 3,4,5 material eaxmination required after PWHT. I assume P1 Material does require any NDT AFTER Stress Relief.
Do you agree with me?
Thanks

RE: Is MPI Mandatory for Group P1 Material after PWHT

Yes.

RE: Is MPI Mandatory for Group P1 Material after PWHT

4872,
Your questions regarding ASME B31.3 MPI requirements have been asked and answered herein and in your Thread No. 292-260627. If your Contract requires RT and MPI of P1 pipe butt welds after PWHT, it exceeds B31.3 requirements and you should understand that the writers of that contract know that their requirements exceed those of B31.3. Why then are you pursuing the same line of questioning?      

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources