INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Recommended a second hydrotest if PWHT done after first hydrotest?

Recommended a second hydrotest if PWHT done after first hydrotest?

Recommended a second hydrotest if PWHT done after first hydrotest?

(OP)
I have a new pressure vessel which is not Code stamped. For process conditions it is required to be PWHT, but this requirement was added after the vessel had been hydrotested. The vessel is still at the shop and will now receive a PWHT.

Is it recommended to perform a second hydrotest after the PWHT is complete? Any responses are appreciated.

RE: Recommended a second hydrotest if PWHT done after first hydrotest?

if this was a code vessel, it would have to be hydrotested after the pwht.

Hydrotest is the last thing to be done after all fabrication processes are complete.

but this is not a vessel.

If it were me, i would re hydro and roll the cost into the adder for pwht.

RE: Recommended a second hydrotest if PWHT done after first hydrotest?

Quote:

Is it recommended to perform a second hydrotest after the PWHT is complete? Any responses are appreciated.

Yes. See Section VIII, Div 1 UG-99.  

 
 

RE: Recommended a second hydrotest if PWHT done after first hydrotest?

I think a few more details are required as OP states this is not a code vessel and the PWHT is required for process reasons. Granted the second hydro would be preferred approach if it's just a stress relief that is needed for process conditions a lower temperature approach might be the way to go.  

RE: Recommended a second hydrotest if PWHT done after first hydrotest?

Assuming that the contract specification required design, fabrication and testing to be done per ASME VIII but stamping was not required due to location of installation, the vessel should be rehydrotested.

RE: Recommended a second hydrotest if PWHT done after first hydrotest?

(OP)
Thank you for all of the responses. We've decided that the vessel will be re-hydrotested after the PWHT.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources