INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Curing of Masonry Walls Question

Curing of Masonry Walls Question

Curing of Masonry Walls Question

(OP)
I designed a 18'-0" high, 12" masonry wall.  The inside is protected from the elements and the outside is not (Michigan -45 degrees +-).  How long should it cure before placing roof joists on them?

RE: Curing of Masonry Walls Question

Depends on the load and the strength of the grout.  Masonry code requires 2000 psi grout but in the Cincinnati area I find we usually get 3000 psi grout.  I would check the capacity with full dead and 3/4 of the live and wind (normal load combinations) to determine what would be required.  I would not expect to need more than 3 to 7 days if you are getting 3000 psi grout.  Chances are with 12" CMU the face shell will handle the gravity loads.  Just be wary of the wind, which may still work as a 12" unreinforced gravity wall anyway if it is reinforced as an intermediate reinforced shear wall.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources