INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

damaged pipe

damaged pipe

damaged pipe

(OP)
we have a piece of A106 B pipe that has damage on the bevelled end . we are working under B31.3 Normal Service ,
where would i look to find the appropriate code section
that allows  me to 'butter ' the bevelled end to correct the gap before welding the joint ?

thanks  

RE: damaged pipe

see B31.3 - 328.5.1 General Requirements for Welding. Welding is permitted for alignment purposes and this approach can be used for weld repairing damaged end preps for fit-up.

RE: damaged pipe

Since there is almost always a piece of pipe somewhere that has to be cut to fit, my preference might be to set the damaged joint aside to be used when I need to trim a piece to fit.

RE: damaged pipe

(OP)
agreed rneil , and generally thats what i would do as well , this piece however is 30 " with a W.T. of 2.25"
so i need to butter it and be able to stand behind the decision. thanks for the help metenger .

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources