INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME B16.11 dictated bore vs. nominal pipe OD & SolidWorks

ASME B16.11 dictated bore vs. nominal pipe OD & SolidWorks

ASME B16.11 dictated bore vs. nominal pipe OD & SolidWorks

(OP)
The input:

I have a 2" nominal pipe (2.375" outer diameter) that I need to socket weld into a bore I'm referencing from B16.11.  B16.11 for a 2" nominal pipe gives "B", the socket bore diameter, as 2.426/2.406.  

My questions:

1) Why is there such a large gap (.031" min) between pipe OD and socket bore?

2) How do I add a weld bead in SolidWorks if a coincident edge is not present (between pipe OD and socket bore)?

Assumptions:

1) Heat from welding may cause thermal expansion of pipe OD.
2) Pipe is dimensioned from the ID, so the OD is subject to a variance of it's OD dimension of 2.375".


Much thanks for any input!
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources