INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Electric Distribution Utilily Bonding to Building Ground

Electric Distribution Utilily Bonding to Building Ground

Electric Distribution Utilily Bonding to Building Ground

(OP)
Please provide feedback on the subject matter below....

What can it be said about having an electric utility be bonded to the building ground conductor for a high rise electrical distribution system? Should the electric utility be bonded to the building ground conductor or not?  please advise......

RE: Electric Distribution Utilily Bonding to Building Ground

Does this utility feeds the high rise?

Are there Codes where this building is?

Rafiq Bulsara
http://www.srengineersct.com

RE: Electric Distribution Utilily Bonding to Building Ground

(OP)
Indeed, the electric utility provides electrical power to the high rise electrical system.

The electrical system withing the high rise system was build based on the NEC 2008. Please advise............

RE: Electric Distribution Utilily Bonding to Building Ground

So they are already interconnected, aren't they?

So what could be the answer? You still haven't clarified what part of the utility you want to interconnect...



 

Rafiq Bulsara
http://www.srengineersct.com

RE: Electric Distribution Utilily Bonding to Building Ground

There is a full article on Grounding in the NEC 2008, perhaps you want to refer to that.

Rafiq Bulsara
http://www.srengineersct.com

RE: Electric Distribution Utilily Bonding to Building Ground

Yes, utility neutral must be bonded to building ground.  This is required per the NEC.    The NEC also describes in great detail how this is to be accomplished.  



 

RE: Electric Distribution Utilily Bonding to Building Ground

(OP)
Thanks DPC.

Can you please advice where within the NEC code I can find the details for this subject matter.  

RE: Electric Distribution Utilily Bonding to Building Ground

NEC 250.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources