INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Drought condition impact on new slab

Drought condition impact on new slab

Drought condition impact on new slab

(OP)
We are experiencing a drought condition in Dallas that has left the area without rain for 60+ days.  I am about start construction on a large home that will be on a "engineered" post tensioned slab on piers.  The soil is black clay and I am concerned about the possibility of heaving once the water returns to the soil.  Comments?

RE: Drought condition impact on new slab

The problems with swelling clays in Texas are sufficient to be noted in many foundation engineering text books -- so your concerns are probably well justified. Given that it is a regional problem you would do well to contact a local geotechnical consultant to review the plans, and if warranted, test the soils.

RE: Drought condition impact on new slab

You may try lift the slab from the soil by interposing a styrodur layer as thick as the heave usually there expected, or altogether in the air. In any case I would review the reinforcement for such circumstance.

RE: Drought condition impact on new slab

I'm not sure about the actual conditions you may experience in Dallas but in Mildura (Australia) we generally define our region as arid and hence design for up to 70mm of soil movement.

One method of preparing the site during dry weather is to build a small bund wall around the building perimeter and soak the area of the building foundation for a period of time to boost the soil water content and hence reducing the impact of heave. To be fully effective we generally need to have a damp follow up period after construction. If this is unlikely then try wetting the perimeter of the new building to help retain some moisture in the soil.

Regards

sc

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources