Sect. VIII drawing requirements?
Sect. VIII drawing requirements?
(OP)
Are there any?
The quality control manager at my previous employer said that we were required to place on the drawing set general arrangement a reasonable facsimile of the code nameplate. I'm thinking that was required to comply with our quality manual, and not with the code per say, but in trying to confirm this I cannot see anything in the code regarding drawing requirements. I could be missing it...
The quality control manager at my previous employer said that we were required to place on the drawing set general arrangement a reasonable facsimile of the code nameplate. I'm thinking that was required to comply with our quality manual, and not with the code per say, but in trying to confirm this I cannot see anything in the code regarding drawing requirements. I could be missing it...
--------------------------------
Fitter, happier, more productive





RE: Sect. VIII drawing requirements?
most do it anyway
client likes to make sure stamping is correct
RE: Sect. VIII drawing requirements?
--------------------------------
Fitter, happier, more productive
RE: Sect. VIII drawing requirements?
so why not on the dwgs?
Not too good if shown on the calculations,
so where do you think is a preferred location?
RE: Sect. VIII drawing requirements?
RE: Sect. VIII drawing requirements?