INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Underground Building.

Underground Building.

Underground Building.

(OP)
Hello all;

I am designing an underground building which has a length of 200 feet and width of 60 feet. The height of the walls is 29 feet and it will have a dirt cover of 3 feet (The slab will see 3 feet of dirt). EFP pressure from the geo-report is 50 pcf/ft. Seismic is 15 H (inverted triangle). Surcharge is around 100 psf, first ten feet. No groundwater is present.

Per the architect, we are not allowed to put any columns in the middle of the building. So we decided to put columns only around the perimeter, 20 feet on center.

My question is the following;

I will be using a special reinforced concrete moment frame, has anyone design this type of building using a different system?

Thanks.
 

RE: Underground Building.

If underground and the "columns" are to be embedded in the mass of the retaining walls I wouldn't conceptuate this as a moment frame. The walls themselves will be taking in shearwall action, along the stiffness of the slab (even wint protruding visible beams), and maybe mat, the seismic forces that in the end origine these categories. If the columns separate from the walls you would have a bit more a case, but I would still think in the same antiseismic behaviour where retaining shearwalls would be predominating in taking the seismic action.

RE: Underground Building.

I would probably use pretensioned T's or Double T's and connect the ends to develop moment.  First kik at the kat!

Dik

RE: Underground Building.

Agree with ishvaaag.  Sounds more like a box of shear walls and diaphragm slabs than a moment frame.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.