INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stress checking requirement after revised pipe rooting at field.

Stress checking requirement after revised pipe rooting at field.

Stress checking requirement after revised pipe rooting at field.

(OP)
For this flow of work
1. Pipe rooting was designed by piping design group
2. doing stress analysis by piping stress group
3. Revise drawing as per comment from piping stress group
                  .
                  .
                  .
                etc.
Final step. Issue the drawing with stress report for construction

After that if at construction field have the problem with pipe rooting such as it is ostruct something and they want to change the old rooting

Did we need to doing stress analysis for new pipe rooting ?
Or revise the drawing to the as-biult drawing version only ?
Why ?

Thankyou.,

RE: Stress checking requirement after revised pipe rooting at field.

You need to do three things:
1. Do a new stress analysis for the revised routing
2. Retrain both the designer and the checker they do a better job of field survey, routing and checking in the future,
3. Require the checker to go to the field to walk down the routing before he or she does an analysis

RE: Stress checking requirement after revised pipe rooting at field.

A full analysis may not be necessary.  However, an experienced stress engineer does need to compare the change to the approved routing and make an assessment of the impact.  If the change is minor, the engineer may be able to approve it by inspection.  However, if the change is substatial and/or involved rotating equipment, a more detailed review may be needed.

Now, what constitutes minor vs. substantial?  That's really a judgement call and why it should involve a senior engineer.

Edward L. Klein
Pipe Stress Engineer
Houston, Texas

"All the world is a Spring"

All opinions expressed here are my own and not my company's.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources