INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Air Change Requirement

Air Change Requirement

Air Change Requirement

(OP)
Hello everybody,
At present, I am designing a  facility where dead bodies are brought for washing and finally sent to the visiting room where the relatives will have last look at it.

As per Ahsrae, we need to maintain min.10 air change rate (100% fresh air) in this washing area,due to this, huge amount of conditioned air to be supplied and exhausted and eventually, the the  chiller capacity is becoming almost double with this ACH as  compared to the normal design (by considering load from building envelope and occupants).

By considering 10 ACH: Plant Capacity = 240 Tons

By considering load due to building envelope and occupants: Plant Capacity = 165 Tons.

Can anybody advice me of reducing plant load without compromising air change requirement.

Thanks and regards,

RE: Air Change Requirement

Use energy recovery.  A wheel will give you 3-8% crossover contamination (without purge).  If this is not acceptable (it is acceptable for lavatories), then go with a flat plate.  This will give you 0% contamination, but only for sensible heat.

RE: Air Change Requirement

Renewaire

They have crossflow HX`s with some latent transfer

The way we build has a far greater impact on our comfort, energy consumption and IAQ, than any HVAC system we install

RE: Air Change Requirement

Have you seen any of those 'latent' plate HXs in action Abby? The last time I looked at one my thought was that it kinda looked like soggy carboard being used to transfer heat and moisture. Haven't specified one yet.

RE: Air Change Requirement

lol, actually cardboard would work

Poor efficiency compared to a wheel, but less moving parts, no cross contamination.

If you build an ERV with a wheel right you can make clean air leak towards the exhaust side.

I am testing out a wheel from roof top systems in my own home down here.

The way we build has a far greater impact on our comfort, energy consumption and IAQ, than any HVAC system we install

RE: Air Change Requirement

Is there a (hopefully low) diversity factor that could be applied?

Why is is necessary to have 100% OA at times when the space is not being used for it's design purpose?

RE: Air Change Requirement

100%Fresh air is taken only to prevent smaell/odor form the dead corpse.
You can use the heat pipe to recover the heat from the exust air so that you can precool the Fresh air and reduce the load on the chiller.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources