INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HUD Foundation [Retrofit Existing Structure]

HUD Foundation [Retrofit Existing Structure]

HUD Foundation [Retrofit Existing Structure]

(OP)
I have been doing HUD approved foundation designs for new mobile homes for a few months now.  However, I have not done a retrofit design yet.  The current structure is a 27'x72' and sits on dry stacked blocks.  I have researched numerous techniques to bring this foundation into compliance for financing.  The simplest way for my contractor and hopefully more cost effective, is to dig and pour reinforced "mats" next to the existing dry stacked blocks.  Then stack new blocks.  Also, dig and pour "mats" for the tie downs.  It is even suggested to outline the newly stacked blocks with 1/4" surface bonding cement.  However, the MP 907f is out of date and I can't find new information on HUDs website or from anyone that I call who is employed by HUD.  

Keep in mind that for new designs... continuous runners are used for FHA loans and continuous runners along with a monolithcally poured perimeter footing is used for USDA lonas.

Does anyone do these on a usual basis and have any suggestions?  I have the Permanent Foundations Guide... I have gotten many different interpretations on Section 503-4.

Thanks in advance.
   

RE: HUD Foundation [Retrofit Existing Structure]

General Comments:  Over the last eight years I have been asked to design foundations new mobile homes on several occasions. Despite efforts to get interpretations or confirmation of the information in the Permanent Foundation Guide I have not had any success either.
http://www.huduser.org/publications/destech/permfound.html

Appears that you are on your own to employ good engineering practice in accordance with the Guide, as you see fit.  In my case (with hurricane wind potential), I have turned down those jobs since the Owners consider a properly design foundation to be "ridiculously" oversized.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources