INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

LEED Credit 6.1

LEED Credit 6.1

LEED Credit 6.1

(OP)
I'm working on a project in Dallas that is pursuing LEED Credit 6.1 - Stormwater Quantity. My questions are these......

- Does detention count as mitigation of stormwater volume for the appropriate storms? It obviously meets the intent for rate, but I'm not sure if it would qualify for volume.

- If detention does qualify, how do you calculate the pre-developed volume? Is this something you have to do in HEC-HMS or is there a down and dirty way to do it?

Thanks for any tips....

RE: LEED Credit 6.1

Detention does not count for the Quantity Credit, detention is only temporay.  The intent of the credit is to mimic the predevelopment runoff volumes.  Depending on the ammount of impervious area on the site there are different rules for the site.  You'll need to use some form of retention such as infiltration, stormwater reuse(irrigation), pervious pavers, ect.

I'm assuming that if you're concerned with the quantity part of the credit the existing site is 50% or greater inpervious.  If the existing site is less then 50% impervious you only have to meet the rate part for the credit.

The pre-developed volume would be the volume of runoff from the site as it sits today, before your project.  You can use the SCS(NRCS now)Unit Hydrograph method to calc the runoff by hand or use a software such as HydroCAD(My personal choice) to calc the runoff.  A lot of software is just an automated version of the SCS method.

If you're going to be doing a lot of this type of work or stormwater in general invest in HydroCAD.  The software is relatively easy to use and works great for runoff volumes and pond sizing.  Some of the more complicated system modeling is beyond the software's capacity but for most smaller sites it work excellent.

 

RE: LEED Credit 6.1

(OP)
bpattengale,

thanks for the response...i am in the situtaion where  existing imperviousness is less than 50%. when reading the LEED reference guide, Case 1/Option 1 requires "implement a stormwater management plan that prevents the post development peak discharge rate and quantity from exceeding the predevelopment peak discharge rate and quantity for the 1yr/2yr 24hr storm".

i'm interpreting the "quantity" as volume and obviously "rate" is rate. how do you interpret "quantity"?

 

RE: LEED Credit 6.1

Sorry, I was looking at an older version of the Credit. You're correct in your iterpretation, Version 3 has changed to include the quantity control in Option 1 also. I haven't done a LEED project under the newest version.

I'd look at stormwater reuse as one of the more cost effective options to reduce the runoff.  Most likely it would be reused as irrigation, but on the extreme end it can be used similarly as grey water for flushing of toilets.

Pervious pavement is also another option, assuming you have soils that will readily infiltrate water, or else it becomes more of a detention facility then retention.

Green roofs are another option, but I've yet to see one put in on a project where it was proposed.  The liturature that I've read has them at about the same cost at traditional roofing systems, but usually the estimates from Contractors come in substatially over the traditional systems, plus they can increase the building's structural requirements depending on the type of system used. So green roofs are usually the first thing to get cut when the buget starts to grow.  The cost factor could also be that there aren't a whole lot of contractors experienced with them in my area of the county (Minnesota).

In general getting LEED certified is not cheap, especially at the higher levels. Just a heads up when the cost start coming back.

RE: LEED Credit 6.1

You could look up what's called "Credit Interpretation Rulings" or CIRS from the USGBC.  I've worked on a few LEED projects in dealing with the stormwater credits, SSc6.1 and SSc6.2, although all of these were LEED version 2.2.  The CIRS helped a great deal in seeing what other contractors or engineers were dealing with in trying to implement infiltration and flow rate control.  The CIRS will give you a good feel for what is allowed per past credit rulings.  A note of caution however, is that just because the ruling was made on one particular project does not automatically mean that it will or can be applied to your project.

On one of my past projects, there was an existing infiltration plan for the entire site (including the LEED project boundary).  Since this plan was already in place and currently in use, I was able to use this as my quality control for credit 6.2 without having to design or implement a new strategy for the LEED project site.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources