INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Weakening shear walls

Weakening shear walls

Weakening shear walls

(OP)
I sometimes work in demolition.  As part of the preparation for explosive work in concrete shearwalls it is common for contractors to remove the heavy reinforcement stiffeners at ends and corners in order to allow drills to perforate the walls longitudinally.

I have seen situations where the design structural engineer assumed the drill would pass between heavy bar on the end of a shear wall, but it would not, so the contractor on the job just cut them out.

Since there are no longer any stiffeners should the walls be analyzed as columns regarding their vertical buckling resistance.  All the plate theory applications I can find assume that at least one side will be clamped or pinned, but in this instance both sides are free.  Can someone guide me to a reference for this condition?

RE: Weakening shear walls

If I understand you well (I am not familiar with demolition practice) even with the corners cut of core shearwalls you still count with the relative bracing provided through the floor coming from the orthogonal remnants of the as built core shearwall. So each shearwall segment should be calculated in the new situation with P-Delta, reduced stiffnes as proper, and beam-column check for p-small delta between the floors, assuming the overall P-Delta check remains satisfactory.

RE: Weakening shear walls

The walls most likely span vertically from floor to floor.  The heavy reinforcement in the ends/corners is to take the tension/compression in the shearwall.  I assume you are checking to make sure the wall will not fall once the end rebar is cut.  It would still be able to span from floor to floor, but its function as a shearwall will be basically eliminated.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources