What is "premature refusal" for driven piles?
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Premature refusal
RE: Premature refusal
RE: Premature refusal
RE: Premature refusal
The bedrock is quite a bit higher than believed. Usually a result of not enough test borings. I have been embarrassed.
RE: Premature refusal
In many locales, it is truly amazing at how much bedrock will differ in elevation in relatively short distances. At the plant site here, there was more than a 25 m elevation difference in bedrock over 35 m length. Very unstable (uneven) bedrock surface that even more boreholes would/could lead to even more confusion.