INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hydrotest Requirement per ASME B31.1

Hydrotest Requirement per ASME B31.1

Hydrotest Requirement per ASME B31.1

(OP)
Folks,

I need some information with respect to hydrotesting of piping per B31.3. Do we have any reference to below in code?
1) Test medium temperature,
2) Minimum equipment or pipe temperature,
3) Rate of pressure increase (??? PSIG/Min.)
4) Hold time,
5) Rate of pressure decrease (???? PSIG/Min.)
6) Is this standard practice, to isolate PSV's during hydrotest or depends on owner's specifications.

Would appreciate your help.

Regards,

Meck91
 

RE: Hydrotest Requirement per ASME B31.1

For B31.1 see paragragh 137, or look in the index uner "pressure testing"
 

RE: Hydrotest Requirement per ASME B31.1

Or if you really meant B31.3 as referenced in the post, then refer to para 345 in that code, for all the requirements.
(Owner's specs will likely go into the detail that you are seeking though.)

Regarding isolation of PSVs during hydrotest - they are set at not more than design pressure (well at least one will be), so testing piping at 1.5 times design pressure means that any PSVs must be isolated in order to achieve that pressure.

Cheers,
John
 

RE: Hydrotest Requirement per ASME B31.1

Please refer 345.4 in B31.3-2004


1) Test medium temperature,
 
The fluid shall be water unless there is the possibility of damage due to freezing or to adverse effects of water on the piping or the process. In that case another suitable non-toxic liquid may be used. if the liquis flammable,its flash point shall be at least 49 deg c, and consideration shall be given to test environment.
    

2) Minimum equipment or pipe temperature,

Refer as above
 
3) Rate of pressure increase (??? PSIG/Min.)

Not specfied in para 345.4 of B 31.3...however in 345.5 and 345.6 of B 31.3 for leak test , it specifies the pressure shall be gradually increased in steps until the operating pressure is reached.  


4) Hold time,

Nothing specified in standar....however, we prefer 30 minute hold time.
 
5) Rate of pressure decrease (???? PSIG/Min.)

Not specified in B31.3...but should be reduced gradually

6) Is this standard practice, to isolate PSV's during hydrotest or depends on owner's specifications.

Yes, PSV must be gagged or removed and blinded.
 

RE: Hydrotest Requirement per ASME B31.1

Hello gentlemen, would you please tell me what code is B31.3 referring to?

RE: Hydrotest Requirement per ASME B31.1

B31.3 is a code - full name is ASME B31.3 ASME Code for Pressure Piping

RE: Hydrotest Requirement per ASME B31.1

ASME b31.3
345.2.2
other test requirements
a)examination for leaks. A leak test shall be maintain for at least 10 min. and all joints and connections should be examined for leaks.

and this is a minimum time if you want to increase as ak1956 for 30 min it is ok
for me I preffer 1 hr min

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources