Groundwater Issue
Groundwater Issue
(OP)
I have a client who needs to place concrete caissons 42" below grade (frost) for a new deck but he has groundwater in the bottom of the holes. What is the best thing for him to do? How would I determine an allowable soil bearing pressure?






RE: Groundwater Issue
RE: Groundwater Issue
RE: Groundwater Issue
In my area (Alberta), we wouldn't consider anything as shallow as 42" because the frost can go much deeper than that, but I don't know whether or not that is pertinent to your site.
If you overexcavate and replace the "mush" with gravel, be absolutely sure you are below the depth of frost penetration or you will get heaving when the reservoir freezes.
Perhaps drilled concrete friction piles or steel screw piles are easier alternatives.
BA