Date on template
Date on template
(OP)
$PRP:"SW-ShortDate" is what I used on my template to get the date but I notice that this updates to today's date when I resave the drawing if I need to make a change/ECO?
Is there another $PRP code I should be using?
Is there another $PRP code I should be using?
drawn to design, designed to draw






RE: Date on template
http:
Matt Lorono
CAD Engineer/ECN Analyst
Silicon Valley, CA
Lorono's SolidWorks Resources
Co-moderator of Solidworks Yahoo! Group
and Mechnical.Engineering Yahoo! Group
RE: Date on template
http://www.eng-tips.com/viewthread.cfm?qid=181106
http://www.eng-tips.com/viewthread.cfm?qid=125752
http://www.eng-tips.com/viewthread.cfm?qid=117291
RE: Date on template
I can't download the file for some reason. It's hanging up on me.
drawn to design, designed to draw
RE: Date on template
Matt Lorono
CAD Engineer/ECN Analyst
Silicon Valley, CA
Lorono's SolidWorks Resources
Co-moderator of Solidworks Yahoo! Group
and Mechnical.Engineering Yahoo! Group