INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Chiller Testing Prior to Tie-in to Existing System

Chiller Testing Prior to Tie-in to Existing System

Chiller Testing Prior to Tie-in to Existing System

(OP)
I've got 5 brand new Trane Centrifugal chillers in a new central plant that we've constructed for an office building.  I have to do a majority of the chiller commissioning prior to tying the new system into the existing chilled water riser.  Does anyone know of any ways to simulate building load?  I would use the new heating hot water system that we've installed, but I can't fire the boilers due to an AQMD moratorium on new boiler permits.

RE: Chiller Testing Prior to Tie-in to Existing System

Moratorium with SC-AQMD permits was recently lifted.

RE: Chiller Testing Prior to Tie-in to Existing System

(OP)
imok2,

The website you refer to seems to be only for computer simulations of building loads for the purpose of chiller selection and design.  Our chillers are already installed.  I need to somehow simulate the building load on the chilled water system for our commissioning and functional testing.

Thanks, though.


KiwiMace,

The moratorium has been conditionally lifted, but this requires purchase of several million dollars worth of ERC's.  The owner isn't sure they want to do that yet.

Thanks

RE: Chiller Testing Prior to Tie-in to Existing System

how about feeding the chilled water circuit of one into the condenser circuit of the other.  You will still need to get rid of a bit of heat though manageable through the cooling tower perhaps.

RE: Chiller Testing Prior to Tie-in to Existing System

Would this be a consideration?

Trailer and skid mounted hydronic heating boilers with control hoses & circulating pumps. Pre-piped and wired for easy connection to your existing system

RE: Chiller Testing Prior to Tie-in to Existing System

Can you use the new chillers to cool the condenser water for existing system chillers?  You'd need to make sure the condenser water was clean.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources