INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ACI 318-08 Concrete Testing

ACI 318-08 Concrete Testing

ACI 318-08 Concrete Testing

(OP)
my coworker tells me ACI318-08 calls for 3 28-day cylinders instead of 2.  wondering if anyone was seeing this hapen yet out there in USA.

RE: ACI 318-08 Concrete Testing

That is only if you are using 4"x8" cylinders.  If you are using 6"x12" cylinders, then only two are required.

Greg

RE: ACI 318-08 Concrete Testing

And yet it is interesting that most project specifications that I have seen in Asia require 3 specimens for a 28-d strength . . .

RE: ACI 318-08 Concrete Testing

i still see 2 called out because most specs are 20 years old and never updated. technically the 3 4x8 cylinders was not accepted by ibc unless the eor approved its use. recent adoption (ibc '09) references aci that says "either or" with 2 6x12 or 3 4x8.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources