INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tieback Wall with Shotcrete Facing

Tieback Wall with Shotcrete Facing

Tieback Wall with Shotcrete Facing

(OP)
Does anyone know of any good resources for the design of the tieback anchorage zone reinforcing in a shotcrete wall facing?  

RE: Tieback Wall with Shotcrete Facing

ACI 318 would probably be the best place to look. Treat the tieback as if it were a column/reaction point. Depending on your layout of your tiebacks you could treat it as a two way slab system or a 1 way slab system (depending on spacing vertically and horizontally). Using SAFE or other 2D FEM program will help determine moments. In the local area of the tieback you should check for punching shear and bearing.

If you are taking about soil nails though you should look at the FHWA manual (geotech circular)

RE: Tieback Wall with Shotcrete Facing

Search the Pennsylvania Department of Transportation web site for their Design Manual-4, Appendix O.

RE: Tieback Wall with Shotcrete Facing

The links that ishvaaag and I presented above are for soil nail walls, not tiedback walls.  If you have a tiedback wall, then the tieback anchors are almost always attached directly to the soldier beams, whether thay are steel beams, drilled shafts, or secant piles.  In that case, the wall facing is attached to the soldier beams, not to the tieback anchor heads.  For steel soldier beams, the facing (whether cast-in-place or shotcreted) is attached to the soldier beams with welded, headed, tension studs.  If using concrete drilled shafts or secant piles, the facing can be attached with rebar dowels.

RE: Tieback Wall with Shotcrete Facing

http://www.dot.state.pa.us/Internet/BQADStandards.nsf/publications?readform

Takes a while to download.

PEInc is right about the soldier piles with welded studs. I typically design it as a 1-way slab between soldier piles using ACI.

If you are installing tiebacks in an existing concrete wall as a retrofit, then you would have to go through the ACI and/or Masonry institute design checks.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources