INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Piping Arrangement of Plate & Frame for Water Side Economizer

Piping Arrangement of Plate & Frame for Water Side Economizer

Piping Arrangement of Plate & Frame for Water Side Economizer

(OP)
I am struggling with whether to pipe a plate and frame (150 ton) in series or parallel with two 400 ton chillers for water-side (w-s) economizer cycle.  The questions is approach off of the tower and supply water temperature to be supplied during w-s economizer operations.  The conditions are arid climate with average high's of 85-90F in the summer with only a three month mechanical cooling load.  The base load the remainder of the year is 150 ton or less.  The facility is a hospital with base load required 24/7.

Anyone with experience in this application?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources