INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

8" CMU / placed w/ incorrect horizontal joint reinforcing

8" CMU / placed w/ incorrect horizontal joint reinforcing

8" CMU / placed w/ incorrect horizontal joint reinforcing

(OP)
Am inspecting on a project where a quantity of 8" CMU was constructed prior to my arrival.  Some walls are as high as 20 courses.  Metal frame building approx. 50' x 100' with 8" CMU with #5 at 48" vert and bond beams at 48" w/ 4#5.

Problem:  All of the 8" CMU placed and grouted to date appears to contain incorrect horizontal joint reinforcing.

Placed: 2 wire ladder type for 12" CMU Note: This 2 wire horizontal joint reinforcing was placed so that one of the two wires is on the outside of the 8" CMU to act as a brick tie/anchor.

Required: 3 wire ladder type for 8" CMU.  This 3 wire horizontal joint reinforcing should have been placed so that one of the three wires is on the outside of the 8" CMU to act as a brick tie/anchor and the other two of three wires are placed in the CMU bed joints.

Also, the placed horizontal joint reinforcing does not appear to have the required minimum 6" lap.  A quantity of the horizontal joint reinforcing appears to have various laps of 0" to 3".

Already reported obs to EOR who is now cogitating...but just as a heads-up, other than demo, is there a fix for this?

RE: 8" CMU / placed w/ incorrect horizontal joint reinforcing

With bars at 48" oc in both directions, the ladder type reinforcement may just be there to attach the veneer.  Except for extremely high seismic areas, the bars at 48" is enough to confine the CMU.

Your EOR might just recommend a drilled in anchor system for the veneer.

RE: 8" CMU / placed w/ incorrect horizontal joint reinforcing

Agreed, drilled-in anchors should solve it!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources