INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

afghanistan snow loads

afghanistan snow loads

afghanistan snow loads

(OP)
I am working on a structural design for a facility in Kabul.  I am using the military's UFC Design Code (along with IBC and ASCE).  Unfortunately, these references do
not provide a design value for ground snow loads for this area. Any advice.  

RE: afghanistan snow loads

Might be worth an inquiry to the State Dept to see if they could point you in the right direction.   

RE: afghanistan snow loads

Try using the data from STANAG 2895. I don't have a copy handy but the British Def Stan should be using the same data and gives the following guidance(DStan 00-35 part 4 issue 4 Chapter 7-01, table 4)

For semi-permanent facilities (assumes snow is not cleared for whole season)

Specified limit: 240kg/m2
Maximum ever recorded:586kg/m2

Specified limits only equalled/exceeded on average 1 in every 10 years.

The standard notes that altitude or wind leading to asymmetric loading can change these values considerably...

RE: afghanistan snow loads


The Norwegian Gouvernmental Building Service has an interesting pamphlet realted to your question, advicing on snowloads and dimensioning and allowable loads.

Titel translates roughly as 'When to shovel off (snowloads) and when to run'. (Regrettably available only in Norwegian)

Necessity to evaluate snowloads origins partly from a periode in the seventies with too low and lax dimensioning rules in Norway, and some serious breakdowns especially for 'hall type' constructions.

Resume on some points:

Snowload on buildings should be taken as the 50 year max.
Depending on municipal climate this is now set from 150kg/m2 to 350 kg/m2 in Norway (one value for each municipality).
To dimension locally the load one might assume same dimensional data for load on roof as dept measured on ground over the years.
Weight of wet snow is set at 300 kg/m3, dry 150kg/m3.
Simple structures as halls with framework(factories?) is more suspectible to break down on skew loads and less safe on overloading than more firm and solid constructions.

When measuring actual load (for purpose of evaluating breakdown danger or shoveling load off) take uneven distributed load into consideration. Max, minimum and avarage actual load must all three be considered separately and together. Shoveling must be done evenly not to create uneven loads and great flakes of snow to slide off. The last might create damaging vibrations in the bearing construction.

Your dimensioning should hence be in two parts:

One part giving the assumption of maximum load (350 kg will for instance give about 1,2m of wet snow evenly distributed)

The second part should be an instruction on when to shovel off the snowload including measuring and offloading guidelines, if this not already exists locally.

Instructions should include protecional routines for roof covering not to be damaged by shoveling.




 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.