INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tubesheet Design for Div-2 Ed 2004 Code Stamp Job

Tubesheet Design for Div-2 Ed 2004 Code Stamp Job

Tubesheet Design for Div-2 Ed 2004 Code Stamp Job

(OP)
We have designed exchanger with Div-2 Ed 2004 with ASME code stamp requirement. Since Div-2 does not give Tubesheet thickness calculations, we had performed calculations with Div-1 UHX which is conservative approach. But the PE is insisting to do FEA becuase Div-2 does not allow anywhere to use UHX. My question is
(1) Is the PE view correct?
(2) Why it is not accpetable though it is conservative? (3) Similarly can we use Tube-Tubesheet joint calculations as per UHX since these are not given in Div2. (But Ed 2007 Div.2 has provided these calculations same from 2004 Div.1)
If it is acceptable to use Div-1, Please tell me the relevant clause reference.
Eagerly waiting for your reply
Thank you
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources