INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

LV VFD Cable Application

LV VFD Cable Application

LV VFD Cable Application

(OP)
Certain VFD manufacturer requires the feeder  cables for VFD be the cables with 1 or 3 grounding wires. But I have found any code requirements for this in CEC or NEC. My concern is the site inspecter will inspect this point. Even though we may not have issues in the short period of time.   

RE: LV VFD Cable Application

If the VFD instructions require a specific cable configuration, the NEC requirement that equipment be installed per the instructions means that the NEC requires you use the specific cable configuration required by the manufacturer.  Don't know about the CEC.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.