Auger Cast Grout Piles
(OP)
How many piles should be set aside at the begining, to be used for load tests before the execution phase of the construction of the Deep Foundations?
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Auger Cast Grout Piles
10% for all between 45 aln 100 cm
25% for all over 100 cm
must be tested in one or other way for "in situ" piles according to CTE.
However need not be load tests, (but integrity, sonic etc) for which a percentage is not set. For big numbers of piles in an "uniform" soil 1 to 3% should be more than enough.