INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME I - Steam Drum

ASME I - Steam Drum

ASME I - Steam Drum

(OP)
Hi,
Can anybody guide me, that as a Boiler manufacturer ("s" Stamp Holder), we subcontracted Steam drum ( As per ASME I) to other manufacturer!
Other manufacturer sent the built drum with "S" Part stamp and partial data report to us.
Now we found that, the Coupling on the stam drum require bigger size!
in this case how to handle this? As a boiler manufacturer
(has valid "S" certificate), can we replace this couplings by our self? If yes, do will have to documented this? Does Final MDR require remark about this?
Your prompt reply will be highly appriciated?
Thanks in advane
BPVN

RE: ASME I - Steam Drum

Quote:

Now we found that, the Coupling on the stam drum require bigger size!
in this case how to handle this? As a boiler manufacturer
(has valid "S" certificate), can we replace this couplings by our self? If yes, do will have to documented this? Does Final MDR require remark about this?

Yes, you can change the coupling but you must document this on a partial data report. Check with your AI for the necessary documentation requirements.
 

RE: ASME I - Steam Drum

(OP)
Hi Metengr,
Thanks for quick reply.
But i want to clarify that, we didn't built the drum and we bought it with Partial data report and "S" Part stamp!
SO we can not document this on a partial data report!
Now we as a boiler manufacturer has to replace couplings on that built steam drum!
In this case, can we change couplings on built steam drum, which bought with "S" stamp and partial data report?
If yes, How? Reference?
Your prompt reply will be highly appriciated!
Thanks
BPVN

RE: ASME I - Steam Drum

BPVN;
Check with your Authorized Inspector, since you also hold an ASME S stamp.

RE: ASME I - Steam Drum

Yes, your AI/AIA can help you answer this question. Consulting your AI will ensure coordination with the applicable jurisdictional rules.
In my opinion, and I am sure alot of others have their opinions, there is more than one approach to satisfy this scenario. As long as there is a paper trail, and it meets jurisdictional and Code compliance, it should be a simple process.  

FAQ731-376: Eng-Tips.com Forum Policies

RE: ASME I - Steam Drum

Assuming that a holder of an A Certificate assembles the boiler, the A-Certificate holder can also perform the work as part of the assembly. Your company, as the Boiler Manufacturer, will use its S Certificate to stamp the drum and complete the P3 Form after completion of final hydrotest and signature of the A-Stamp holder and its AI.

RE: ASME I - Steam Drum

If the drum has only a partial and NB No. and registration was not included or issued, yes you can work on the drum by geting AI authorization and issuing the proper documents.
The AI may or may not accept your request and you may have to send it back to the original stamp holder for repair.
genb

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources