I have two assy. Skeleton - Control Structue (~20 parts) and assy with ~1k parts and about 100 linked parts. I would like to create new revision of this job - add suffix. Any idea/tips how to do it?
In first step I used clone assembly but it not works :(
Regards
Siwy
I have two assy. Skeleton - Control Structue (~20 parts) and assy with ~1k parts and about 100 linked parts. I would like to create new revision of this job - add suffix. Any idea/tips how to do it?
In first step I used clone assembly but it not works :(
Regards
Siwy





RE: Ho to revise Start Parts?
Cloning should work. Have a look at your load options (partial loading off, load interpart data on with all levels)
Regards
Didier
RE: Ho to revise Start Parts?
It works. BTW I called to GTAC and they said me that it is immposible :).
I found one "bug", If I run clone assembly and want to use setings from log file, aplication cant find links betwen assy. Propably dont use full loading option?