Orange Peel reducer fabrication
Orange Peel reducer fabrication
(OP)
Due to non avilability we have to fabricate a 10"x12" reducer from schedule 40, A53 pipe.
Will it be acceptable as per B31.3 if the sample is proof tested as per 304.7.2
Any help will be appriciated
G.OPS
Will it be acceptable as per B31.3 if the sample is proof tested as per 304.7.2
Any help will be appriciated
G.OPS





RE: Orange Peel reducer fabrication
RE: Orange Peel reducer fabrication
http://
RE: Orange Peel reducer fabrication
PatrickR: This is a North Africa Installation. When I say unavailability I mean available in Warehouse store
vezeos: Is CFR 49 that the link refers, necessarily means compliance with B31.3
GOps