INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Orange Peel reducer fabrication

Orange Peel reducer fabrication

Orange Peel reducer fabrication

(OP)
Due to non avilability we have to fabricate a 10"x12" reducer from schedule 40, A53 pipe.

Will it be acceptable as per B31.3 if the sample is proof tested as per 304.7.2

Any help will be appriciated

G.OPS

 

RE: Orange Peel reducer fabrication

Where are you located that you can't get a 10 x 12 reducer?   

RE: Orange Peel reducer fabrication

(OP)
Thanks for reply

PatrickR: This is a North Africa Installation. When I say unavailability I mean available in Warehouse store

vezeos: Is CFR 49 that the link refers, necessarily means compliance with B31.3

GOps
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources