INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

UW-52 Clarification

UW-52 Clarification

UW-52 Clarification

(OP)
Hi there,

After doing some searching on this site I couldn't really find the answer i was looking for.  Based on some of the threads that I have read, my question must be pretty basic.

The welds in question are type 3.
Regarding Extent of spot, Section VIII-1 calls for a minimum of one spot per 50ft of weld.  UW-52(c) specifies 6" per spot.

I have a total of 83ft of weld, so I need 2 6" spot welds.  Is this correct?  It just doesn't seem like very much of a sample.

Thanks!

RE: UW-52 Clarification

2x6" is correct. It will be sufficient to prove once again the welding spec and qualification, in addition to the extra material thickness you have included in your design / fabrication.

RE: UW-52 Clarification

Am I reading table UW-12 wrong?  The way I interpret it, you don't get any extra credit for RT of a Type 3 joint.  You just have to use a .60 join efficiency.

RE: UW-52 Clarification

YES SIR

That's what it says.  single sided with no provisions of a good root pass with reinforcement to meet UW-35.

RE: UW-52 Clarification

So.....I'm confused about the original question, if UW-52(c)doesn't apply to Type 3 joints.

RE: UW-52 Clarification

you are mixing paragraphs.

uw-52 is what and how much gets radiographed

uw-12 is joint efficiencies

TRUE his does not get anything out of RT of the welds but maybe his customer is requiring spot rt.

If it is truley a type 3 weld, i don't know how he will ever get clear radiographs  unless he actually puts in a good root pass.  then it's a type 1 weld and he could get better joint efficiency

RE: UW-52 Clarification

(OP)
Basically, I am but welding 10" sch40 pipe, to make up a Section VIII-1 vessel.  Our calculations were done to using type 3 joints and the design calls for spot x-ray.

RE: UW-52 Clarification

If the design calls for spot x-ray per ASME VIII-1, then you are correct with 6" per 50', two shots in your case. Keep in mind this is only valid if the shots capture every welder. It does not seem like much, but if one of them fails you will get the opportunity to see more!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources