INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Artificial Turf- Runoff Calculation

Artificial Turf- Runoff Calculation

Artificial Turf- Runoff Calculation

(OP)
My client wants to install artificial turf by eliminating existing natural grass. I was requested to calculate and proove new development will not increase the runoff from the site.
Turf has a impermeable bed with a perforated treches connected to a catch basin.
Please help if some one has experience in this cal.
Thanks a lot!

RE: Artificial Turf- Runoff Calculation

If you're capturing all the rainfall in the turf system, there may be no surface runoff.  In this case, the bed will receive all the rainfall, so a high CN value (98) is appropriate for the rainfall entering the bed.

Estimating the Tc is more complex.  This will depend on the travel time through the turf, bed, and trench system.  Depending on the exact design, you may be able to model this as a sub-surface "pond".
 

Peter Smart
HydroCAD Software
www.hydrocad.net
 

RE: Artificial Turf- Runoff Calculation

Since your system is sealed, we know that the runoff volume from your turf system will be greater than natural grass, which allows some degree of infiltration.

The peak flow will depend on how quickly this volume is released.  If you have enough storage available in the base, you can control the peak discharge by deliberately restricting the outlet.  In effect, the sub-surface storage becomes a detention pond.

Of course, this will effect the peak timing, which will effect how your discharge combines with adjacent flows to the same drainage system.
 

Peter Smart
HydroCAD Software
www.hydrocad.net
 

RE: Artificial Turf- Runoff Calculation

I use to work in research for a company that manufactured foam backing for Astroturf.  The type of foam was closed cell PVC which allowed minimal moisture absorption, therefore, assume rainfall as 100% runoff if foam backing is still closed cell.  Also talk to the suppliers about your concern as development of artificial grass may have change since the early 70's.  

RE: Artificial Turf- Runoff Calculation

100% runoff (CN=98 or Rational C=0.95), with a Tc based upon the travel time through the discharge pipes to the detention bed.

And don't, don't, don't use the area under the field as the detention facility.  This may cause the field to float during rainfall events.  You want the facility to quickly and effectively drain to another area for stormwater control.

RE: Artificial Turf- Runoff Calculation

I have worked on some projects where earth tubes are placed beneath the sports pitches. therefore it seems to make sense to put stone over the pipes and under the sports pitch to save excavation, cost and improve efficiency of earth tubes heat recovery system! Any comments??

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources