INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Well start-up/revival

Well start-up/revival

Well start-up/revival

(OP)
I was wondering whether anyone could provide some assistance on their experience of what has been done in a situation where a well has been shut-in for a period of time (say during a compressor wash or period of low gas demand) and is required to be revived.

There is currently no artificial lift and a colleague has suggested "packing in" the line to hold the pressure, but I have had a look at the hydrate formation temperature and they are a problem due to the seabed temperature.

I am wanting to understand what has been done in other situations as above.

RE: Well start-up/revival

bouk,
On the basis that you mention compressor wash or low gas demand as the reason the well is shut in, I assume you are talking about re-starting a gas well after a long term shut in.

It is important to know the context of the well in question is it a subsea or a 'dry' platform well. In the former is it part of a collection of subsea wells (ie tied into a subsea manifold) or is it a single well tie-back or daisy-chain?

I hazard a guess that it is subsea on the basis that you mention seabed temperatures.

You are correct in being concerned about 'packing' a subsea flowline at seabed temperatures as the risk of hydrate formation is high at high pressures and low temperatures.
The only way this scenario is workable (ie maintaining pressure in the line during shut down) is if the line was suitably inhibited (using Methanol, ethanol, MEG etc) against hydrate formation BEFORE it was shut in.
If continuous inhibition is used during normal operation it is likely that this is the case, however careful checks need to be applied to determine any 'top-up' inhibitor requirements for shut in AND Re-start operations.

Existing Operating procedures should be available to provide with clear instructions and dosage rates to apply for planned (and unplanned) shutdowns.

As each development is different it is difficult to provide you with a general guidance as to what to do in each circumstance as there are many variables to consider. That's why i point you in the direction of the operating procedures if they exist, if they don't exist then a significant amount of engineering and simulation work is required to produce these procedures (which then need to be risk assessed / HAZOP'ed according to operators requirements). Even summarising this work without any specific details would take longer than appropriate in a forum such as this.

Regards
NMcC

Nick McCarthy
Flow Assurance Consultant
http://www.linkedin.com/in/flowassurance
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources