INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stormwater Infiltration

Stormwater Infiltration

Stormwater Infiltration

(OP)
Two Questions..

1) Is there a reccomended rate or range of rates of infiltration when using structural fill?

2) Are allowable/acceptable infiltration rates for recharge governed by local ordinances or the BMP Manual?  Site is in PA

Thanks!

RE: Stormwater Infiltration

Since you mention "structural fill", I'm guessing this is an underground chamber system.

The infiltration rate will depend on the surrounding (native) soil, and not on the structural fill.  There are no "recommended" rates.  It all depends on the soil and groundwater conditions of the particular site.
 

Peter Smart
HydroCAD Software
www.hydrocad.net
 

RE: Stormwater Infiltration

(OP)
The existing profile consists of uncontrolled fill overlying natural soils.  We performed infiltration testing on the natural soils, but unfortunately they lie below seasonal high groundwater elevations.  Our reccomendation was be to overexcavate the uncontrolled fill and "build" a basin consisting of a 2' or more thick layer of structural fill.

RE: Stormwater Infiltration

The stone storage is typically modeled as a "pond", with the voids providing the storage.  In this scenario, the water is assumed to flow freely within the stone and form a level pool.  As such, the infiltration rate of the stone itself usually doesn't enter into the calculation.

Of course, if your inflow is so high that a level-pool will not form, you would need to perform a more complex mounding analysis within the stone itself.  But if your flow is that high, stone storage may not be adequate for your site.


 

Peter Smart
HydroCAD Software
www.hydrocad.net
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources