INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Construction Loads

Construction Loads

Construction Loads

(OP)
How many PSF does ASCE 37 list as a construction load?

RE: Construction Loads

What are you specifically looking for? There are several loads provided, but some of the construction load information you will need to obtain from the contractor (i.e. cut sheets of cranes, pump trucks, etc....). Please clarify.

RE: Construction Loads

(OP)
I am looking for the construction load for the demolition of a concrete slab.  I took the dead load of the slab and assumed a LL of 100 psf for the construction load.  I wanted to know what the code lists

RE: Construction Loads

You shall look in another direction. What was the original design load of the slab? You should limit the construction load by that, otherwise, further analysis, and/or temporary strengthening would be required. Also, the LL often is controlled by the equipment, which produces high concentrate load in a small area, but could have profund impact.

RE: Construction Loads

If the slab is to be demolished why do you care what the construction load is ?

RE: Construction Loads

The normal construction load I have used for personnel and light equipment is 20 psf, which, as mentioned previously mentioned, should be much lighter than what the slab was designed for.  

This construction loading would more likely be used in designing the shoring for support when the slab was curing.

Mike McCann
MMC Engineering

RE: Construction Loads

apazmino, its really equipment dependent. As kslee1000 mentioned the equipment will typically control. You'll also need to be very careful on specifying demolition sequencing to prevent the demolition crew from demolishing structural supports that they are standing on (A safety issue). In certain zones you may want to shore temporarily. If you are demolishing multiple levels you may have to shore several levels below as well...because the demoed floor material is going to end up on the floor below.

Construction loads are good, but there is also the construction impact load that needs to be accounted for as well.  

RE: Construction Loads

(OP)
Thanks all

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources