INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Strip Load surcharge on Sheet pile wall with sloped backfill

Strip Load surcharge on Sheet pile wall with sloped backfill

Strip Load surcharge on Sheet pile wall with sloped backfill

(OP)
I am doing analysis on a sheet pile headwall for a CMP culvert under a railroad. I have been looking but have been able to figure out how to determine the lateral pressure from a strip load surcharge when the backfill has a 1:2 slope. I orginally just used the Bousinesq formula, but because of the slope and distance from the centerline of track, it seems that this may be much too conservative.

I was looking at this thread thread255-150849: Surcharge Pressure on Retaining Walls , the last post mentions a reference from Poland, and I really wish I knew the exact source so that I could include it in my calculations, at least for why the surcharge won't need to be included.  Does anybody know of a publication that refers to how to calculate the "Clear distance to surcharge"?  
 

RE: Strip Load surcharge on Sheet pile wall with sloped backfill

lunera,

In lieu of better references, find the Caltrans Shoring and Foundation Manual (readily available on the Web). If you really have these uncertainties, call in an experienced geotechnical engineer to help you.

Jeff
 

RE: Strip Load surcharge on Sheet pile wall with sloped backfill

What is the strip surcharge loading from? Normally the headwall would be "in line with" the embankment and wouldn' have a surcharge - the only "surcharge" would be the track loading by the train but it would be on level ground at the top of the 2:1 embankment slope.  Have you done a quick Culmann Method??

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources