INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

spray ball coveraget test

spray ball coveraget test

spray ball coveraget test

(OP)
Dear all,
one of our customer insists to have a spray ball coverage test during FAT of 90 seconds. We demonstrated  them that in 180 second we can clean the vessels perfectly, but  we have some problems with 90 seconds.
Are ther in literature  or something else some recomendations about the duration of the  test  during FAT?
Thanks

RE: spray ball coveraget test

Golden rule is the customer has gold so they mak the rules. Ask for the basis of their requirements i.e. are they trying to determine direct coverage as distinct to indirect or splash coverage of the spray ball, or are they trying to validate the minimum cleaning time. There may be numerous reasons for their requirements. The cleaning regime may remain at 180 seconds, however the minimum cleaning time and other cleaning parameters must be validated and tested.
What is the CIP solution, is it recirculated or an expensive medium? This may also be the driver to reduce cleaning time.
To return to your question, there is no literature in relation to time or other recomendations around FAT that I am aware of. The FAT should be based on performance and agreed design parameters, generally set down in contract or specifications.

Mark Hutton


 

RE: spray ball coveraget test

I agree with Mark's comments. The time period seems to be a bit ridiculous, if it is demanded only during FAT and not a contractual agreement. You may cover the tank in less time if you provide more flowrate. Take the average rates recommended in ASME BPE 2007 and see what results you got.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources