INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Farm Ditch

Farm Ditch

Farm Ditch

(OP)
Hi Guys,

It seems I've been using stormwater modeling programs for too long now and I can't figure out how to do something that should be simple.

Here' the problem.  I have a 80 acre project that is currently being farmed.  When the property was purchased a few years ago it had a ditch running through it that carried flows from the north to the south.  There were a couple of culvert crossings and it meandered through the property.  The farmer had to move the ditch to the east and straighten it out in order to better use the property for farming.

The local permitting agency is giving us trouble in that we didn't go through them first (permitting, etc.).  However, in our state (Florida), farmers can get away with more than a land developer so our task is to prove that the new ditch does not negatively affect anything upstream or downstream.  If we do this, no permit is required.

The ditch has equal or greater capacity than the original ditch per Mannings, but I'm running the risk of sending more water downstream because the ditch is more efficient.  I wanted to do a simple calc and not get into something complicated but I'm having a brain freeze....

RE: Farm Ditch

Ok,
Does the new ditch convey the same flow as the original ditch or did the relocation change the watershed boundary?  If the flow rates are the same you should be fine for capacity.  However, you may need to compare exit velocities so the new ditch will not be anymore erosive than the existing ditch.  If it is by your description of more efficient you may have to add mitigation measure to reduce the erosion.  Hopefully, the new ditch exits the property at the same location as the old ditch.   

RE: Farm Ditch

(OP)
Yes, same flow.  We're covered on erosion.  That's not a worry.  Yes, ditch exits property at the same location.
 

RE: Farm Ditch

You can use a couple of XSECs & Manning's for both existing and proposed conditions and evaluate normal depth & velocity to show the minimal change. Call it good.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources