INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Allowable Movement

Allowable Movement

Allowable Movement

(OP)
I am analyzing some short drill shafts (using COM624). They are rigid, and the analysis shows that the tip is kicking off - there is no practically no flexure in the shaft.

Does anyone know of references, or know of some guidelines on the tolerable lateral movement of drill shaft under lateral loads? How much is too much movement? I normally embed the the shaft that there is practically no movement, but I think sometime the embedment might be too much.
(Apart from the tolerance set by the structural engineer etc how much should I be concerned about movement within the soil?)

Any thoughts?

RE: Allowable Movement

Typically geotechs will recommend limiting the tip deflection to 1/2 to 1 inch. NAVFAC and other documents discuss this.

RE: Allowable Movement

(OP)
You may be referring to movement at the head of the drill shaft/pile.  I am referring to lateral movement of the bottom tip.  Bowles, 1995, 'Foundation Analysis and Design' said that displacement at the bottom in the direction of the load much over 1 or 2mm indicates that the analytical model may be inadequate or the lateral load is too large for the pier-soil system.   

RE: Allowable Movement

Do you know you are actually getting movement?  Do you have any of the piles instrumented?  Or, is movement only indicated by your calculations and if so how much movement do you show?

RE: Allowable Movement

You might want to scan through Poulos and Davis' book on Pile Foundation Analysis and Design - they have extensively covered laterally loaded piles - you might find something in there.  It's been a while for me with laterally loaded piles; nothing jumped out at me.  Tomlinson's Pile book might also have information. - but Jim made a good point - your movements - Analysis or Actual

RE: Allowable Movement

(OP)
These movements were based on calculations.  I expect movements, but I just wanted to know what's an ecceptable limit(if one exists).  I was getting movement in the order of 1/3".

 

RE: Allowable Movement

Doesn't seem out of line with examples in P&D.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources