INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Effect of excessive cement in stabilised subbase

Effect of excessive cement in stabilised subbase

Effect of excessive cement in stabilised subbase

(OP)
Ihave carried out laboratory test for subbase stabilisation trial test.According to the test results revealed that the use of 2.5%cement is adequate to aquire a strength of more than 1MPa including the initial consumption of lime/cement.But in practice when the Contractor has started to lay the stabilised layer on the road under construction,the quality control of the materials taken from the road during spreading of the stabilised subbase.When moulded and cured for seven days and soaked for four hours and crushed it yield a high strength than anticipated.The stregth obtained varied from (2.87 to 2.06)MPa.This seems to be biger than 1MPa minimum given in the specifications.In the specification no maximum has been given only minimum which is 1MPa.This increment will not affect the works such as craking of the stabilised layer?Can Iaccept the section if no craking of the pavement layer has been observed?

RE: Effect of excessive cement in stabilised subbase

Two common problems exist.  The first is that you'll get more shrinkage in the cement stabilized material.  This will cause cracks and they will reflect through a flexible pavement layer (asphalt).

The second problem is bonding.  You will definitely need to apply a strong tack coat to make sure you don't lose bond between the asphalt and base.  Since you mentioned that this is a subbase, you might want to consider some roughening of hard surface prior to adding base layer if it is a granular layer as opposed to an asphalt layer.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources